4
Whether for residential building or
industrial, for small or large building
sites, the TRIO wall formwork system
is adaptable and versatile. These
assembly instructions are provided to
ensure its problem-free use. They
show the basic TRIO system, with
formwork heights h = 270 and h = 330,
and its usage, with add-on systems
and safety features. At the end you
will find out something about the care
of the product.
The identification of the components
is made without the addition of “TRIO.
Measurements without units are given
in cm.
The individual parts of the system
h = 270 are shown in Part F with their
item numbers. Please refer to your
PERI specialist if you have any
questions.
Introduction
For all applications, the relevant
additional parts and tables are
available.
TRIO L
(aluminium powder coated in yellow)
can be combined as required with
TRIO 270.
TRIO 330
For office buildings and industrial
construction.
TRIO Structure
For components with special
demands on the surface.
Tie system DW 15 and DW 20
These assembly instructions contain
information on the handling and correct
use of the TRIO formwork system.
Safety instructions and load instructions
must be adhered to exactly.
For other uses, or use beyond that
described, it is necessary to obtain
our specific agreement and additional
construction instructions from the
operator.
The operator must ensure that the
construction and use instructions
delivered by PERI are present and
available for the workers.
Fundamentally, only materials in good
condition may be used. Damaged
components must be changed.
For the use of our products, the most
recent safety and environmental
regulations applicable to the respective
countries must be adhered to.
The assembly instructions and the
PERI offer and implementation plans
do not replace the working and
assembly instructions from the
operator on the building site.
Correct use
Product features
The TRIO 270 wall formwork system
is a heavy formwork for shuttering
walls, pillars, foundations and other
concrete components.
The basic equipment includes the
panels, corner and filler elements,
alignment couplers, compensation
waler, push-pull props, work platforms
and all the necessary small parts for
assembly. The steel parts are powder
coated in red.
Shuttering is carried out with 5 element
heights and 6 widths in a grid size of
30 cm. The elements can be used
upright or on their sides.
With TRIO it is possible to fulfil the
flatness requirements of DIN 18202
up to line 7 of table 3. See GSV table
part E.