33
Guardrails
consisting of:
handrail post holder TRIO 65
handrail post HSGP 66
Fig. 49.
With a falling height > 3.0 m guardrails
on the scaffolding edge is necessary.
Assembly is carried out horizontally.
With vertical assembly, this is carried
out, for example, from a mobile
scaffold.
Assembly
1. Attach handrail post holder TRIO 65
in the connection holes of the
elements.
Only possible on vertical struts.
2. Secure with cotter pin.
3. Insert handrails HSGP 66.
4. Insert safety rails and secure with nails.
5. Assemble aide de levage TRP 67.
6. Lift with crane.
When raising the element, it should
be ensured that the safety rail is not
damaged by the crane sling. Fig. 50.
With extended formwork units,
assemble the guardrails during the
pre-assembly.
Dismantling
Do not lay formwork elements onto
the handrail post holders TRIO 65.
Scaffolding parts provided by the
contractor must be in accordance
with the relevant safety regulations
(in Germany, DIN 4420).
Timber parts must be of at least
Sort Class S10 according to
DIN 4074 and must be identified
(BGR 169).
Cross-section of the safety planks:
3 cm x 15 cm.
Secure boards with nails.
65
Fig. 49
> 3,0 m
66
Fig. 50
66
65
B6 Working and
Concreting Scaffold
max. support width 1,35 m
max. load width 2,10 m